Queue ID
FPL-418
Capacity
99 MW
Technology
Gas
Status
active
Location
Miami-Dade, FL
Region
Southeast
Developer
FPL
IA Status
Facility Study

FPL-418

FPL-418BetaActiveGasFPLLBNL

99 MW generation in Miami-Dade, FL · In queue since September 2020 · Proposed COD May 2025

99 MW

Capacity

1

Components

Gas

5y 8m

In Queue

Facility Study

IA Status

COD target: 2025

Interconnection

Total Duration

4y 8m

Schedule

12 months past proposed COD

Facilities Study50%
Queue EntrySep 18, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-05-01

About

The proposed project FPL-418 is a 99 MW gas-fired generation project located in Miami-Dade County, Florida. The developer and utility are both Florida Power & Light (FPL). It is interconnected in the Florida Reliability Coordinating Council (FRCC) queue, with an entry date of September 18, 2020. The proposed commercial operation date is May 1, 2025. The project's interconnection status is currently in the Facility Study phase.

The point of interconnection (POI) for the project is the Turkey Point Substation.

Generated from interconnection queue and public data sources

Project Details

State

FL

County

Miami-Dade

Grid Region

Southeast

Market

Developer

FPL

Utility

Florida Power & Light

Entity

FPL

Service Type

Point of Interconnection

Turkey Point Sub

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.