FPL-418
99 MW generation in Miami-Dade, FL · In queue since September 2020 · Proposed COD May 2025
99 MW
Capacity
1
Components
Gas
5y 8m
In Queue
Facility Study
IA Status
COD target: 2025
Total Duration
4y 8m
Schedule
12 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-05-01
The proposed project FPL-418 is a 99 MW gas-fired generation project located in Miami-Dade County, Florida. The developer and utility are both Florida Power & Light (FPL). It is interconnected in the Florida Reliability Coordinating Council (FRCC) queue, with an entry date of September 18, 2020. The proposed commercial operation date is May 1, 2025. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection (POI) for the project is the Turkey Point Substation.
Generated from interconnection queue and public data sources
State
FL
County
Miami-Dade
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Turkey Point Sub
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-418