74.5 MW generation in Indian River, FL · In queue since March 2022 · Proposed COD April 2027
74.5 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Facility Study
IA Status
COD target: 2027
Total Duration
5y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-04-30
The proposed project FPL-427 is a 74.5 MW solar generation project located in Indian River County, Florida. The developer is Florida Power & Light (FPL). It is interconnected to the Florida Reliability Coordinating Council (FRCC) queue as project "FPL-427" since March 2, 2022. The proposed commercial operation date is April 30, 2027. The project's interconnection status is currently in the Facility Study phase.
The project consists of 74.5 MW of solar photovoltaic generation. The point of interconnection is the Kiran-Eldora 230kV substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
FL
County
Indian River
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Kiran-Eldora 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.