Project FPL-434 — Project Summary

Queue ID
FPL-434
Capacity
74.5 MW
Technology
Solar
Status
active
Location
Desoto, FL
Region
Southeast
Developer
FPL
IA Status
Facility Study

FPL-434

FPL-434BetaActiveSolarFPLLBNL

74.5 MW generation in Desoto, FL · In queue since March 2022 · Proposed COD October 2027

74.5 MW

Capacity

1

Components

Solar

4y 2m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

5y 7m

Facilities Study50%
Queue EntryMar 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-31

About

FPL-434 is a proposed solar generation project with a total capacity of 74.5 MW. The development is located in Desoto County, Florida, within the Southeast region, and is being developed by Florida Power & Light (FPL). The project entered the Florida Power & Light interconnection queue on March 2, 2022, with a proposed commercial operation date of October 31, 2027. Its interconnection status is currently in the Facility Study phase.

The proposed project consists of 74.5 MW of solar generation. The point of interconnection is the Whidden Substation.

Generated from interconnection queue and public data sources

Project Details

State

FL

County

Desoto

Grid Region

Southeast

Market

Developer

FPL

Utility

Florida Power & Light

Entity

FPL

Service Type

Point of Interconnection

Whidden Sub

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project FPL-434