FPL-437
74.5 MW generation in Manatee, FL · In queue since March 2022 · Proposed COD December 2026
74.5 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
FPL-437 is a proposed solar generation project with a total capacity of 74.5 MW, located in Manatee County, Florida. The project is being developed by Florida Power & Light (FPL) and interconnected to the Florida Power & Light system at the Keentown-Manatee 230kV point of interconnection.
The project is currently active in the Florida Reliability Coordinating Council (FRCC) interconnection queue, with an entry date of March 2, 2022. The proposed commercial operation date is December 31, 2026, and the project's interconnection agreement status is currently in the Facility Study phase.
Generated from interconnection queue and public data sources
State
FL
County
Manatee
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Keentown-Manatee 230kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-437