FPL-439
74.5 MW generation in Desoto, FL · In queue since March 2022 · Proposed COD January 2028
74.5 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-31
FPL-439 is a proposed solar generation project with a total capacity of 74.5 MW. Located in Desoto County, Florida, within the Southeast region, the project is being developed by Florida Power & Light (FPL). It consists of a single 74.5 MW solar component.
The project is currently active in the Florida Power & Light interconnection queue, with an entry date of March 2, 2022. The proposed commercial operation date is January 31, 2028. Its interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the Whidden Substation.
Generated from interconnection queue and public data sources
State
FL
County
Desoto
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Whidden Sub
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-439