FPL-464
74.5 MW generation in Collier, FL · In queue since April 2022 · Proposed COD January 2028
74.5 MW
Capacity
1
Components
Solar
4y 1m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5y 9m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-31
FPL-464 is a proposed solar generation project located in Collier County, Florida, with a total capacity of 74.5 MW. The project is being developed by Florida Power & Light (FPL) and is interconnected to the Florida Power & Light system. It entered the queue on April 21, 2022, and has a proposed commercial operation date of January 31, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project consists of 74.5 MW of solar photovoltaic generation. The point of interconnection is at Collier County. The project is listed in the interconnection queue as FPL-464.
Generated from interconnection queue and public data sources
State
FL
County
Collier
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Collier County
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-464