74.5 MW generation in Indian River, FL · In queue since January 2023 · Proposed COD January 2028
74.5 MW
Capacity
1
Components
Solar
3y 4m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
5 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-31
FPL-493 is a proposed solar generation project with a total capacity of 74.5 MW, located in Indian River County, Florida. The project is being developed by Florida Power & Light (FPL) and is interconnected to the Florida Power & Light utility grid at the Southern Indian River County point of interconnection. It entered the queue on January 6, 2023, and has a proposed commercial operation date of January 31, 2028. The project's interconnection status is currently in the Facility Study phase.
The proposed project consists of 74.5 MW of solar photovoltaic generation. It is located in the Southeast region.
Generated from interconnection queue and public data sources
State
FL
County
Indian River
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Southern Indian River County
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.