FPL-549
74.5 MW generation in Hendry, FL · In queue since January 2023 · Proposed COD April 2033
74.5 MW
Capacity
1
Components
Solar
3y 4m
In Queue
System Impact Study
IA Status
COD target: 2033
Total Duration
10y 3m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2033-04-30
FPL-549 is a proposed solar generation project with a total capacity of 74.5 MW. The development project is located in Hendry County, Florida, within the service territory of Florida Power & Light (FPL). The project, sponsored by FPL, entered the Florida Power & Light interconnection queue on January 6, 2023.
The proposed commercial operation date for FPL-549 is April 30, 2033. As of the current interconnection status, the project is in the System Impact Study phase of the interconnection process. The point of interconnection is near LaBelle, Florida.
Generated from interconnection queue and public data sources
State
FL
County
Hendry
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Near LaBelle
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-549