74.9 MW generation in Bradford, FL · In queue since February 2023 · Proposed COD January 2031
74.9 MW
Capacity
1
Components
Solar
3y 3m
In Queue
Facility Study
IA Status
COD target: 2031
Total Duration
7y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-01-17
FPL-555 is a proposed solar generation project with a total capacity of 74.9 MW, located in Bradford County, Florida. The project is being developed by a Third Party and is interconnected with Florida Power & Light (FPL). It is currently listed as active in the FPL interconnection queue, with an entry date of February 23, 2023, and a proposed commercial operation date of January 17, 2031. The project's interconnection status is currently in the Facility Study phase.
The point of interconnection (POI) for FPL-555 is the Deerhaven (GVL)-Bradford 138kV line.
Generated from interconnection queue and public data sources
State
FL
County
Bradford
Grid Region
Southeast
Market
—
Developer
Third Party
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Deerhaven (GVL)-Bradford 138kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.