FPL-559
74.5 MW generation in Hendry, FL · In queue since July 2023 · Proposed COD October 2033
74.5 MW
Capacity
1
Components
Solar
2y 10m
In Queue
System Impact Study
IA Status
COD target: 2033
Total Duration
10y 3m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2033-10-31
FPL-559 is a proposed solar generation project located in Hendry County, Florida, with a total capacity of 74.5 MW. The project, being developed by Florida Power & Light (FPL), consists of 74.5 MW of solar photovoltaic generation. It is currently in the Florida Power & Light interconnection queue with an entry date of July 25, 2023.
The proposed commercial operation date for the project is October 31, 2033. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is at State Road 80. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
FL
County
Hendry
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
State Road 80
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.