FPL-599
24.5 MW generation in Jackson, FL · In queue since October 2023 · Proposed COD July 2028
24.5 MW
Capacity
1
Components
Solar
2y 7m
In Queue
System Impact Study
IA Status
COD target: 2028
Total Duration
4y 9m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-07-31
FPL-599 is a proposed solar generation project located in Jackson County, Florida, with a total capacity of 24.5 MW. The developer and utility are both listed as FPL (Florida Power & Light). The project consists of 24.5 MW of solar photovoltaic generation.
The project is currently active in the Florida Power & Light interconnection queue, with an entry date of October 2, 2023, and a proposed commercial operation date of July 31, 2028. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Holmes Creek - Defuniak Springs (PS) 115kV line.
Generated from interconnection queue and public data sources
State
FL
County
Jackson
Grid Region
Southeast
Market
—
Developer
FPL
Utility
Florida Power & Light
Entity
FPL
Service Type
—
Point of Interconnection
Holmes Creek - Defuniak Springs (PS) 115kV line
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project FPL-599