Limestone Solar
150 MW hybrid in Macon, GA · In queue since May 2019 · Proposed COD December 2021
150 MW
Capacity
1
Components
Solar
7 years
In Queue
Facility Study
IA Status
COD target: 2021
Total Duration
2y 7m
Schedule
53 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-31
The Limestone Solar project is a proposed 150 MW solar and battery hybrid development in Macon County, Georgia. Interconnection is requested through the Georgia Transmission Corporation (GTC) queue, identified as GTC-GI-118. The project entered the queue on May 30, 2019, and has a proposed commercial operation date of December 31, 2021.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the North Americus _x0013_ Perry 115 kV TL. The solar component has a capacity of 150 MW. The developer is not specified in the available data.
Generated from interconnection queue and public data sources
State
GA
County
Macon
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
North Americus _x0013_ Perry 115 kV TL
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.