Crossroads Solar (GTC-GI-152) — Project Summary

Queue ID
GTC-GI-152
Capacity
150 MW
Technology
Solar+Battery
Status
active
Location
Liberty, GA
Region
Southeast
Developer
IA Status
Facility Study

Crossroads Solar

GTC-GI-152BetaActiveSolarBatteryGTCLBNL

150 MW hybrid in Liberty, GA · In queue since June 2021 · Proposed COD May 2024

150 MW

Capacity

1

Components

Solar

4y 11m

In Queue

Facility Study

IA Status

COD target: 2024

Interconnection

Total Duration

2y 11m

Schedule

23 months past proposed COD

Facilities Study50%
Queue EntryJun 23, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-05-30

About

Crossroads Solar is a proposed 150 MW hybrid solar and battery energy storage project in Liberty County, Georgia. The project, developed by an unknown entity, consists of 150 MW of solar generation capacity. It is located in the service territory of Georgia Transmission Corporation (GTC) and interconnects to the Ludowici - Riceboro 115 kV TL point of interconnection.

The project is listed in the GTC interconnection queue as project GTC-GI-152, with an original queue entry date of June 23, 2021, and a proposed commercial operation date of May 30, 2024. Its interconnection status is currently in the Facility Study phase. The Crossroads Solar project has been the subject of recent news coverage, with 10 articles categorized as industry, regulatory, and grid related.

Generated from interconnection queue and public data sources

Project Details

State

GA

County

Liberty

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

Ludowici - Riceboro 115 kV TL

Data Source

LBNL

ApplicantCrossroads Solar I±IndexBox · 2026-03-28
AgencyOhio Power Siting BoardIndexBox · 2026-03-28
RulingDenialIndexBox · 2026-03-28
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.