Two Rivers Solar
102 MW hybrid in Camden, GA · In queue since March 2022 · Proposed COD December 2024
102 MW
Capacity
1
Components
Solar
4y 2m
In Queue
Facility Study
IA Status
COD target: 2024
Total Duration
2y 9m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-20
Two Rivers Solar is a proposed 102 MW hybrid solar and battery energy storage project in Camden County, Georgia. The project consists of 102 MW of solar generation. It is located in the service territory of Georgia Transmission (GTC) and is listed in the GTC interconnection queue as queue ID GTC-GI-162. The project entered the queue on March 16, 2022, with a proposed commercial operation date of December 20, 2024. Its interconnection agreement status is currently in the Facility Study phase.
The Two Rivers Solar project has been the subject of recent news coverage.
Generated from interconnection queue and public data sources
State
GA
County
Camden
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
Browntown 115 kV Substation
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Two Rivers Solar