Canoochee River Solar
152 MW hybrid in Emanuel, GA · In queue since May 2023 · Proposed COD November 2026
152 MW
Capacity
1
Components
Solar
3 years
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
3y 6m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-11-01
Canoochee River Solar is a proposed 152 MW hybrid solar and battery energy storage project in Emanuel County, Georgia. The project, which consists of 152 MW of solar generation, is interconnected to the Georgia Transmission Corporation (GTC) system. It is listed in the GTC interconnection queue as project GTC-GI-174, with an entry date of May 19, 2023.
The proposed commercial operation date for Canoochee River Solar is November 1, 2026. The project's interconnection agreement status is currently in the Facility Study phase. The point of interconnection is the Live Oak - Wadley Primary 115 kV transmission line. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
GA
County
Emanuel
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
Live Oak - Wadley Primary 115 kV TL
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Canoochee River Solar