Hammond Solar (GTC-GI-181) — Project Summary

Queue ID
GTC-GI-181
Capacity
225 MW
Technology
Solar
Status
active
Location
Floyd, GA
Region
Southeast
Developer
IA Status
System Impact Study

Hammond Solar

GTC-GI-181BetaActiveSolarGTCLBNL

225 MW generation in Floyd, GA · In queue since September 2023 · Proposed COD November 2025

225 MW

Capacity

1

Components

Solar

2y 8m

In Queue

System Impact Study

IA Status

COD target: 2025

Interconnection

Total Duration

2y 2m

Schedule

5 months past proposed COD

Impact Study25%
Queue EntrySep 19, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-11-30

About

Hammond Solar is a proposed 225 MW solar generation project located in Floyd County, Georgia. The project is being developed within the Georgia Transmission Corporation (GTC) service area. It entered the GTC interconnection queue (GTC-GI-181) on September 19, 2023, with a proposed commercial operation date of November 30, 2025. Its interconnection status is currently in the System Impact Study phase.

The proposed project consists of 225 MW of solar photovoltaic generation. Hammond Solar's point of interconnection (POI) is the Hammond - Anniston 230 kV transmission line. The project has been the subject of recent news coverage, with eight articles appearing in categories such as regulatory, industry, deals, and grid.

Generated from interconnection queue and public data sources

Project Details

State

GA

County

Floyd

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

Hammond - Anniston 230 kV TL

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Hammond Solar