Pecan Energy Storage
207.6 MW hybrid in Mitchell, GA · In queue since October 2023 · Proposed COD April 2029
207.6 MW
Capacity
1
Components
Solar
2y 7m
In Queue
System Impact Study
IA Status
COD target: 2029
Total Duration
5y 6m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-04-30
Pecan Energy Storage is a proposed 207.6 MW hybrid solar and battery project located in Mitchell County, Georgia. The project is in the Georgia Transmission (GTC) interconnection queue, identified as GTC-GI-187, with a queue entry date of October 20, 2023. The proposed commercial operation date is April 30, 2029. The interconnection request is currently in the System Impact Study phase.
The project, which consists of 207.6 MW of solar generation, is interconnected at the Raccoon Creek 230 kV SS. Pecan Energy Storage has been mentioned in recent industry news.
Generated from interconnection queue and public data sources
State
GA
County
Mitchell
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
Raccoon Creek 230 kV SS
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.