Talbot U7 (GTC-GI-194) — Project Summary

Queue ID
GTC-GI-194
Capacity
250 MW
Technology
Gas
Status
active
Location
Talbot, GA
Region
Southeast
Developer
IA Status
In Progress (unknown study)

Talbot U7

GTC-GI-194BetaActiveGasGTCLBNL

250 MW generation in Talbot, GA · In queue since August 2024 · Proposed COD March 2029

250 MW

Capacity

1

Components

Gas

1y 9m

In Queue

In Progress (unknown study)

IA Status

COD target: 2029

Interconnection

Total Duration

4y 7m

In Study38%
Queue EntryAug 5, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-31

About

The Talbot U7 project is a proposed 250 MW gas-fired generation project located in Talbot County, Georgia. The project, sponsored by GTC, entered the Georgia Transmission (GTC) interconnection queue as queue ID GTC-GI-194 on August 5, 2024, with a proposed commercial operation date of March 31, 2029. Its interconnection agreement status is listed as "In Progress (unknown study)".

The point of interconnection is planned for the Talbot County 1 or 2 substation. The Talbot U7 project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

GA

County

Talbot

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

Talbot County 1 or 2 substation (TBD)

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.