Altamaha Green Energy
70 MW generation in Wayne, GA · In queue since August 2024 · Proposed COD March 2028
70 MW
Capacity
1
Components
Other
1y 9m
In Queue
System Impact Study
IA Status
COD target: 2028
Total Duration
3y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-01
Altamaha Green Energy is a proposed 70 MW generation project located in Wayne County, Georgia. The project, categorized as "Other" technology, is being developed within the Georgia Transmission (GTC) service area. It entered the GTC interconnection queue (GTC-GI-195) on August 20, 2024, with a proposed commercial operation date of March 1, 2028. The project's interconnection status is currently in the System Impact Study phase.
The proposed project consists of 70 MW of "Other" generation technology. Altamaha Green Energy has been the subject of recent news coverage, with nine articles categorized as deals, industry, regulatory, and development.
Generated from interconnection queue and public data sources
State
GA
County
Wayne
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
Jessup _x0013_ Ludowici Primary 115 kV TL
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26