SR Grady
150 MW generation in Grady, GA · In queue since August 2024 · Proposed COD December 2028
150 MW
Capacity
1
Components
Solar
1y 9m
In Queue
System Impact Study
IA Status
COD target: 2028
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-15
The SR Grady project is a proposed 150 MW solar generation project located in Grady County, Georgia. Interconnection is requested through the Georgia Transmission (GTC) queue, identified as GTC-GI-196, with a queue entry date of August 31, 2024. The proposed commercial operation date is December 15, 2028. The project's interconnection status is currently in the System Impact Study phase.
The point of interconnection (POI) is the South Bainbridge _x0013_ Thomasville 230 kV TL. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
GA
County
Grady
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
South Bainbridge _x0013_ Thomasville 230 kV TL
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about SR Grady