Flint River 780 MW Unit
780 MW generation in Mitchell, GA · In queue since October 2024 · Proposed COD August 2029
780 MW
Capacity
1
Components
Gas
1y 7m
In Queue
System Impact Study
IA Status
COD target: 2029
Total Duration
4y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-08-01
The proposed Flint River 780 MW Unit is a gas-fired generation project located in Mitchell County, Georgia. The project, with a total capacity of 780 MW of gas generation, is being developed within the Georgia Transmission (GTC) service area.
The project is listed in the Georgia Transmission queue as GTC-GI-198, with an interconnection queue entry date of October 9, 2024. The proposed commercial operation date is August 1, 2029. The project's interconnection status is currently in the System Impact Study phase and the point of interconnection is the Raccoon Creek Substation.
Generated from interconnection queue and public data sources
State
GA
County
Mitchell
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
Raccoon Creek Substation
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Flint River 780 MW Unit