IID-GI-2022-154
100 MW hybrid in Imperial, CA · In queue since February 2022 · Proposed COD September 2024
100 MW
Capacity
1
Components
Solar
4y 3m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
2y 7m
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-01
The proposed IID-GI-2022-154 project is a 100 MW hybrid solar and battery energy storage system development in Imperial County, California. The project consists of 100 MW of solar photovoltaic generation. It is located in the West region and is being proposed within the Imperial Irrigation District (IID) interconnection queue.
The project entered the IID queue on February 22, 2022, and has a proposed commercial operation date of September 1, 2024. Its interconnection status is currently in the System Impact Study phase.
Generated from interconnection queue and public data sources
State
CA
County
Imperial
Grid Region
Mountain West
Market
—
Developer
—
Utility
Imperial Irrigation District
Entity
IID
Service Type
—
Point of Interconnection
161 kV L line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.