IID-GI-2023-165
50 MW hybrid in Imperial, CA · In queue since January 2023 · Proposed COD October 2025
50 MW
Capacity
1
Components
Solar
3y 4m
In Queue
System Impact Study
IA Status
COD target: 2025
Total Duration
2y 9m
Schedule
7 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-01
The proposed project IID-GI-2023-165 is a 50 MW hybrid Solar+Battery project located in Imperial County, California. The project consists of 50 MW of solar generation. It is in the Imperial Irrigation District (IID) interconnection queue, with an entry date of January 9, 2023, and a proposed commercial operation date of October 1, 2025. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the 161kV A line.
Generated from interconnection queue and public data sources
State
CA
County
Imperial
Grid Region
Mountain West
Market
—
Developer
—
Utility
Imperial Irrigation District
Entity
IID
Service Type
—
Point of Interconnection
161kV A line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project IID-GI-2023-165