Project IID-GI-2023-165 — Project Summary

Queue ID
IID-GI-2023-165
Capacity
50 MW
Technology
Solar+Battery
Status
active
Location
Imperial, CA
Region
West
Developer
IA Status
System Impact Study

IID-GI-2023-165

IID-GI-2023-165BetaActiveSolarBatteryIIDLBNL

50 MW hybrid in Imperial, CA · In queue since January 2023 · Proposed COD October 2025

50 MW

Capacity

1

Components

Solar

3y 4m

In Queue

System Impact Study

IA Status

COD target: 2025

Interconnection

Total Duration

2y 9m

Schedule

7 months past proposed COD

Impact Study25%
Queue EntryJan 9, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-10-01

About

The proposed project IID-GI-2023-165 is a 50 MW hybrid Solar+Battery project located in Imperial County, California. The project consists of 50 MW of solar generation. It is in the Imperial Irrigation District (IID) interconnection queue, with an entry date of January 9, 2023, and a proposed commercial operation date of October 1, 2025. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the 161kV A line.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Imperial

Grid Region

Mountain West

Market

Developer

Utility

Imperial Irrigation District

Entity

IID

Service Type

Point of Interconnection

161kV A line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.