Project IID-GI-2023-174 — Project Summary

Queue ID
IID-GI-2023-174
Capacity
157 MW
Technology
Other
Status
active
Location
Imperial, CA
Region
West
Developer
IA Status
In Progress (unknown study)

IID-GI-2023-174

IID-GI-2023-174BetaActiveGeothermalIIDLBNL

157 MW generation in Imperial, CA · In queue since April 2023 · Proposed COD June 2029

157 MW

Capacity

1

Components

Geothermal

3y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2029

Interconnection

Total Duration

6y 2m

In Study38%
Queue EntryApr 28, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

About

IID-GI-2023-174 is a proposed 157 MW geothermal generation project located in Imperial County, California. The project is in the Imperial Irrigation District (IID) interconnection queue, with an entry date of April 28, 2023. Its proposed commercial operation date is June 1, 2029.

The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the 230kV Sinclair Substation. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Imperial

Grid Region

Mountain West

Market

Developer

Utility

Imperial Irrigation District

Entity

IID

Service Type

Point of Interconnection

230kV Sinclair Sub

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.