IID-GI-2023-176
157 MW generation in Imperial, CA · In queue since April 2023 · Proposed COD June 2029
157 MW
Capacity
1
Components
Geothermal
3y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2029
Total Duration
6y 2m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
The proposed IID-GI-2023-176 project is a 157 MW geothermal generation project located in Imperial County, California. Interconnecting to the Imperial Irrigation District (IID) at the 230kV Sinclair Substation, the project entered the IID interconnection queue on April 28, 2023. Its proposed commercial operation date is June 1, 2029, and the interconnection agreement status is currently listed as "In Progress (unknown study)".
The development project consists solely of geothermal technology, with a total capacity of 157 MW. The project is located in the Western region and is currently listed as active in the IID interconnection queue.
Generated from interconnection queue and public data sources
State
CA
County
Imperial
Grid Region
Mountain West
Market
—
Developer
—
Utility
Imperial Irrigation District
Entity
IID
Service Type
—
Point of Interconnection
230kV Sinclair Sub
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project IID-GI-2023-176