Warren Meadow Solar (ISO-NE-1086) — Project Summary

Queue ID
ISO-NE-1086
Capacity
74.5 MW
Technology
Solar
Status
active
Location
Knox, ME
Region
ISO-NE
Developer
IA Status
IA Executed

Warren Meadow Solar

ISO-NE-1086BetaActiveSolarISO-NELBNL + Live

74.5 MW generation in Knox, ME · In queue since November 2020 · Proposed COD November 2026

74.5 MW

Capacity

1

Components

Solar

5y 6m

In Queue

IA Executed

IA Status

COD target: 2026

Interconnection

Total Duration

6 years

Construction75%
Queue EntryNov 30, 2020

Interconnection request submitted to ISO/RTO

TCS Study

ISO-NE is transitioning to cluster studies per FERC Order 2023.

Typical: 25–30 months (recent)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2026-11-30

About

Warren Meadow Solar is a proposed 74.5 MW solar generation project located in Knox County, Maine. The project is listed in the ISO-NE interconnection queue as queue ID 1086, with an entry date of November 30, 2020, and a proposed commercial operation date of November 30, 2026. The interconnection agreement for the project has been executed.

The proposed project is linked to the existing Warren Meadow Solar Station operating plant (EIA ID 65708). The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

ME

County

Knox

Grid Region

ISO New England

Market

ISO/RTO Member

Developer

Utility

ISO-NE

Entity

ISO-NE

Service Type

Point of Interconnection

CMP 115kV line Section 80

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ISO-NE
Trading Hub
.Z.MAINE
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LD.HIGHLAND34.5
POI Substation
Highland Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Warren Meadow Solar