Warren Meadow Solar
74.5 MW generation in Knox, ME · In queue since November 2020 · Proposed COD November 2026
74.5 MW
Capacity
1
Components
Solar
5y 6m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
6 years
Interconnection request submitted to ISO/RTO
ISO-NE is transitioning to cluster studies per FERC Order 2023.
Typical: 25–30 months (recent)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-11-30
Warren Meadow Solar is a proposed 74.5 MW solar generation project located in Knox County, Maine. The project is listed in the ISO-NE interconnection queue as queue ID 1086, with an entry date of November 30, 2020, and a proposed commercial operation date of November 30, 2026. The interconnection agreement for the project has been executed.
The proposed project is linked to the existing Warren Meadow Solar Station operating plant (EIA ID 65708). The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
ME
County
Knox
Grid Region
ISO New England
Market
ISO/RTO Member
Developer
—
Utility
ISO-NE
Entity
ISO-NE
Service Type
—
Point of Interconnection
CMP 115kV line Section 80
Data Source
LBNL + Live
- ISO / RTO
- ISO-NE
- Trading Hub
- .Z.MAINE
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- LD.HIGHLAND34.5
- POI Substation
- Highland Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Warren Meadow Solar