Solar
101.128 MW generation in Hartford, CT · In queue since November 2021 · Proposed COD October 2027
101.128 MW
Capacity
1
Components
Solar
4y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
5y 11m
Interconnection request submitted to ISO/RTO
ISO-NE is transitioning to cluster studies per FERC Order 2023.
Typical: 25–30 months (recent)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-15
A proposed solar generation project, known as Solar (ISO-NE-1192), is under development in Hartford County, Connecticut. The project, with a total capacity of 101.13 MW, consists entirely of solar photovoltaic generation. It is located within the ISO-NE regional transmission organization.
The project entered the ISO-NE interconnection queue on November 4, 2021, with a proposed commercial operation date of October 15, 2027. Its interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the N. Bloomfield to Agawam 345kV Line, approximately 3.6 miles north of N. Bloomfield (345kV) and 11.5 miles south of Agawam (345kV).
Generated from interconnection queue and public data sources
State
CT
County
Hartford
Grid Region
ISO New England
Market
ISO/RTO Member
Developer
—
Utility
ISO-NE
Entity
ISO-NE
Service Type
—
Point of Interconnection
N. Bloomfield to Agawam 345kV Line. POI is approximately 3.6 mi north of N. Bloomfield (345kV) and 11.5 mi south of Agawam (345kV).
Data Source
LBNL + Live
- ISO / RTO
- ISO-NE
- Trading Hub
- .Z.CONNECTICUT
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Solar