Grissom Solar
4.99 MW generation in Sullivan, NH · In queue since March 2022 · Proposed COD May 2025
4.99 MW
Capacity
1
Components
Solar
4y 2m
In Queue
IA Executed
IA Status
COD target: 2025
Total Duration
3y 2m
Schedule
12 months past proposed COD
Interconnection request submitted to ISO/RTO
ISO-NE is transitioning to cluster studies per FERC Order 2023.
Typical: 25–30 months (recent)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2025-05-15
Grissom Solar is a proposed 4.99 MW solar generation project located in Sullivan County, New Hampshire. The project is in the ISO-NE interconnection queue as entry ISO-NE-1226, with a queue entry date of March 4, 2022, and a proposed commercial operation date of May 15, 2025. The interconnection agreement for the project has been executed.
The point of interconnection is a 46 kV subtransmission line between GMP Maple Avenue B-42 and the 4402 breaker at the GMP/NGRID demarc considered at Bellows Falls.
Generated from interconnection queue and public data sources
State
NH
County
Sullivan
Grid Region
ISO New England
Market
ISO/RTO Member
Developer
—
Utility
ISO-NE
Entity
ISO-NE
Service Type
—
Point of Interconnection
46 kV subtransmission line between GMP Maple Avenue B-42 and the 4402 breaker at the GMP/NGRID demarc considered at Bellows Falls
Data Source
LBNL + Live
- ISO / RTO
- ISO-NE
- Trading Hub
- .Z.NEWHAMPSHIRE
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Grissom Solar