Grissom Solar (ISO-NE-1226) — Project Summary

Queue ID
ISO-NE-1226
Capacity
4.99 MW
Technology
Solar
Status
active
Location
Sullivan, NH
Region
ISO-NE
Developer
IA Status
IA Executed

Grissom Solar

ISO-NE-1226BetaActiveSolarISO-NELBNL + Live

4.99 MW generation in Sullivan, NH · In queue since March 2022 · Proposed COD May 2025

4.99 MW

Capacity

1

Components

Solar

4y 2m

In Queue

IA Executed

IA Status

COD target: 2025

Interconnection

Total Duration

3y 2m

Schedule

12 months past proposed COD

Construction75%
Queue EntryMar 4, 2022

Interconnection request submitted to ISO/RTO

TCS Study

ISO-NE is transitioning to cluster studies per FERC Order 2023.

Typical: 25–30 months (recent)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2025-05-15

About

Grissom Solar is a proposed 4.99 MW solar generation project located in Sullivan County, New Hampshire. The project is in the ISO-NE interconnection queue as entry ISO-NE-1226, with a queue entry date of March 4, 2022, and a proposed commercial operation date of May 15, 2025. The interconnection agreement for the project has been executed.

The point of interconnection is a 46 kV subtransmission line between GMP Maple Avenue B-42 and the 4402 breaker at the GMP/NGRID demarc considered at Bellows Falls.

Generated from interconnection queue and public data sources

Project Details

State

NH

County

Sullivan

Grid Region

ISO New England

Market

ISO/RTO Member

Developer

Utility

ISO-NE

Entity

ISO-NE

Service Type

Point of Interconnection

46 kV subtransmission line between GMP Maple Avenue B-42 and the 4402 breaker at the GMP/NGRID demarc considered at Bellows Falls

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ISO-NE
Trading Hub
.Z.NEWHAMPSHIRE
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Grissom Solar