Battery Storage (ISO-NE-1551) — Project Summary

Queue ID
ISO-NE-1551
Capacity
190 MW
Technology
Battery
Status
active
Location
Worcester, MA
Region
ISO-NE
Developer
IA Status
System Impact Study

Battery Storage

ISO-NE-1551BetaActiveBatteryISO-NELBNL + Live

190 MW storage in Worcester, MA · In queue since May 2024 · Proposed COD January 2027

190 MW

Capacity

1

Components

Battery

2 years

In Queue

System Impact Study

IA Status

COD target: 2027

Interconnection

Total Duration

2y 8m

Impact Study25%
Queue EntryMay 31, 2024

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

ISO-NE is transitioning to cluster studies per FERC Order 2023.

Typical: 25–30 months (recent)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-01-31

About

A proposed 190 MW battery storage project, known as Battery Storage (ISO-NE-1551), is under development in Worcester County, Massachusetts. The project, located within the ISO-NE region, consists entirely of battery storage. It entered the ISO-NE interconnection queue on May 31, 2024, with a proposed commercial operation date of January 31, 2027. The project's interconnection status is currently in the System Impact Study phase.

The Primary Point of Interconnection will be located on the project's property at coordinates 42°21'44.53"N, 72°2'22.57"W, tapping the 115-kV Line A127-4 (Barre-Paxton) approximately 6 km from Barre Substation, which is owned by MA_NGRID.

Generated from interconnection queue and public data sources

Project Details

State

MA

County

Worcester

Grid Region

ISO New England

Market

ISO/RTO Member

Developer

Utility

Entity

ISO-NE

Service Type

Point of Interconnection

The Primary Point of Interconnection will be located on the IC_x0019_s property (Lat, long: 4221'44.53"N, 72 2'22.57"W) by tapping the 115-kV Line A127-4 (Barre-Paxton) at approx. 6km from Barre Substation owned by MA_NGRID.

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ISO-NE
Trading Hub
.H.INTERNAL_HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
LD.BARRE 13.8
POI Substation
Barre Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.