JEA-JEA-Q009
74.9 MW hybrid in Duval, FL · In queue since July 2021 · Proposed COD January 2024
74.9 MW
Capacity
1
Components
Solar
4y 10m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
2y 6m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-01-15
JEA-JEA-Q009 is a proposed 74.9 MW solar and battery hybrid project located in Duval County, Florida. The development project, consisting of 74.9 MW of solar capacity, is in the Jacksonville Electric Authority (JEA) interconnection queue with an entry date of July 7, 2021. The proposed commercial operation date is January 15, 2024, and the interconnection agreement status is listed as "In Progress (unknown study)".
The project is located in the Southeast region and is being developed by JEA. The point of interconnection is the Brandy Branch Substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
FL
County
Duval
Grid Region
Southeast
Market
—
Developer
—
Utility
Jacksonville Electric Authority
Entity
JEA
Service Type
—
Point of Interconnection
Brandy Branch Sub
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN