74.9 MW hybrid in Duval, FL · In queue since May 2024 · Proposed COD September 2027
74.9 MW
Capacity
1
Components
Solar
2 years
In Queue
Feasibility Study
IA Status
COD target: 2027
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-30
JEA-JEA-Q012 is a proposed 74.9 MW hybrid solar and battery project located in Duval County, Florida. The development project, located in the Southeast region, consists of 74.9 MW of solar capacity. The project is listed in the Jacksonville Electric Authority (JEA) interconnection queue with an entry date of May 9, 2024, and a proposed commercial operation date of September 30, 2027. Its interconnection status is currently in the Feasibility Study phase.
The project is being developed by JEA and is interconnected at the Peterson point of interconnection. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
FL
County
Duval
Grid Region
Southeast
Market
—
Developer
—
Utility
Jacksonville Electric Authority
Entity
JEA
Service Type
—
Point of Interconnection
Peterson
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.