LADWP-Q03
250 MW generation in Kern, CA · In queue since September 2007 · Proposed COD May 2014
250 MW
Capacity
1
Components
Solar
18y 8m
In Queue
Construction
IA Status
COD target: 2014
Total Duration
6y 8m
Schedule
146 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2014-05-01
LADWP-Q03 is a proposed 250 MW solar generation project located in Kern County, California. The project is in the Los Angeles Department of Water and Power (LADWP) interconnection queue, with an entry date of September 10, 2007. The proposed commercial operation date is May 1, 2014, and the project's interconnection agreement status is listed as "Construction".
The proposed project consists of 250 MW of solar photovoltaic generation. The point of interconnection is the Barren Ridge 230 kV Switching Station. The developer is listed as LADWP.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
Mountain West
Market
—
Developer
—
Utility
Los Angeles Department of Water and Power
Entity
LADWP
Service Type
—
Point of Interconnection
Barren Ridge 230 kV Sw Station
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.