LADWP-Q08
150 MW generation in Clark, NV · In queue since March 2009 · Proposed COD August 2014
150 MW
Capacity
1
Components
Solar
17y 2m
In Queue
Feasibility Study
IA Status
COD target: 2014
Total Duration
5y 5m
Schedule
143 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2014-08-01
LADWP-Q08 is a proposed solar generation project with a total capacity of 150 MW, located in Clark County, Nevada. The project is listed in the Los Angeles Department of Water and Power interconnection queue, with an entry date of March 26, 2009. The proposed commercial operation date is August 1, 2014.
The interconnection status of the project is currently in the Feasibility Study phase. The point of interconnection is the McCullough 230kV Substation.
Generated from interconnection queue and public data sources
State
NV
County
Clark
Grid Region
Mountain West
Market
—
Developer
—
Utility
Los Angeles Department of Water and Power
Entity
LADWP
Service Type
—
Point of Interconnection
McCullough 230kV Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LADWP-Q08