Project LADWP-Q51 — Project Summary

Queue ID
LADWP-Q51
Capacity
800 MW
Technology
Solar+Battery
Status
active
Location
Millard, UT
Region
West
Developer
Intermountain Power Agency
IA Status
Operational

LADWP-Q51

LADWP-Q51BetaActiveSolarBatteryLADWPLBNL

800 MW hybrid in Millard, UT · In queue since January 2016 · Proposed COD January 2022

800 MW

Capacity

2

Components

Solar + Battery

10y 4m

In Queue

Operational

IA Status

COD target: 2022

Interconnection

Total Duration

6 years

Schedule

52 months past proposed COD

Pre-Study100%
Queue EntryJan 5, 2016

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-01-30

Technology
Solar400 MW · 50%
Battery400 MW · 50%
About

LADWP-Q51 is a proposed 800 MW hybrid solar and battery project located in Millard County, Utah. The development project, proposed by Intermountain Power Agency, consists of a 400 MW solar array coupled with a 400 MW battery energy storage system.

The project is interconnected to the Los Angeles Department of Water and Power (LADWP) grid at the IPP 345kV Switchyard. It entered the LADWP interconnection queue on January 5, 2016, and has a proposed commercial operation date of January 30, 2022. The interconnection agreement status is listed as Operational.

Generated from interconnection queue and public data sources

Project Details

State

UT

County

Millard

Grid Region

Mountain West

Market

Developer

Intermountain Power Agency

Utility

Los Angeles Department of Water and Power

Entity

LADWP

Service Type

Point of Interconnection

IPP 345kV Switchyard

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.