LADWP-Q73
200 MW storage in Los Angeles, CA · In queue since July 2019 · Proposed COD November 2023
200 MW
Capacity
1
Components
Battery
6y 10m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
4y 4m
Schedule
30 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-11-30
The LADWP-Q73 development project is a proposed 200 MW battery storage project located in Los Angeles County, California. The project is sponsored by the Los Angeles Department of Water and Power (LADWP). It is currently active in the LADWP interconnection queue, with an entry date of July 31, 2019. The proposed commercial operation date is November 30, 2023.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Fairfax 138kV Substation. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
CA
County
Los Angeles
Grid Region
Mountain West
Market
—
Developer
—
Utility
Los Angeles Department of Water and Power
Entity
LADWP
Service Type
—
Point of Interconnection
Fairfax 138kV Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LADWP-Q73