Project LADWP-Q88 — Project Summary

Queue ID
LADWP-Q88
Capacity
1000 MW
Technology
Solar+Battery
Status
active
Location
Clark, NV
Region
West
Developer
IA Status
In Progress (unknown study)

LADWP-Q88

LADWP-Q88BetaActiveSolarBatteryLADWPLBNL

1,000 MW hybrid in Clark, NV · In queue since April 2022 · Proposed COD December 2028

1,000 MW

Capacity

2

Components

Solar + Battery

4y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2028

Interconnection

Total Duration

6y 8m

In Study38%
Queue EntryApr 1, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-28

Technology
Solar500 MW · 50%
Battery500 MW · 50%
About

LADWP-Q88 is a proposed 1000 MW hybrid solar and battery project located in Clark County, Nevada. The Los Angeles Department of Water and Power (LADWP) is the utility associated with the project. The hybrid project consists of 500 MW of solar generation and 500 MW of battery energy storage.

The project is in the Los Angeles Department of Water and Power interconnection queue, with an entry date of April 1, 2022. The proposed commercial operation date is December 28, 2028. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is Marketplace 500kV.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Clark

Grid Region

Mountain West

Market

Developer

Utility

Los Angeles Department of Water and Power

Entity

LADWP

Service Type

Point of Interconnection

Marketplace 500kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.