LADWP-Q91
346 MW generation in Los Angeles, CA · In queue since June 2022 · Proposed COD January 2030
346 MW
Capacity
1
Components
Hydrogen
3y 11m
In Queue
In Progress (unknown study)
IA Status
COD target: 2030
Total Duration
7y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-01-01
LADWP-Q91 is a proposed generation project located in Los Angeles County, California, with a total capacity of 346 MW. The project, developed by the Los Angeles Department of Water and Power (LADWP), utilizes hydrogen technology. It consists of a single 346 MW hydrogen component.
The project is currently active in the Los Angeles Department of Water and Power interconnection queue, with an entry date of June 16, 2022. The proposed commercial operation date is January 1, 2030. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Scattergood 138kV Switchyard.
Generated from interconnection queue and public data sources
State
CA
County
Los Angeles
Grid Region
Mountain West
Market
—
Developer
—
Utility
Los Angeles Department of Water and Power
Entity
LADWP
Service Type
—
Point of Interconnection
Scattergood 138kV Switchyard
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LADWP-Q91