LADWP-Q95
346 MW generation in Los Angeles, CA · In queue since January 2023 · Proposed COD January 2030
346 MW
Capacity
1
Components
Hydrogen
3y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2030
Total Duration
7 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-01-01
LADWP-Q95 is a proposed 346 MW hydrogen generation project located in Los Angeles County, California. The project is listed in the Los Angeles Department of Water and Power (LADWP) interconnection queue, under the queue ID LADWP-Q95, with an entry date of January 19, 2023. The proposed commercial operation date is January 1, 2030.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The point of interconnection is the Scattergood 230kV Switchyard. The developer is listed as LADWP.
Generated from interconnection queue and public data sources
State
CA
County
Los Angeles
Grid Region
Mountain West
Market
—
Developer
—
Utility
Los Angeles Department of Water and Power
Entity
LADWP
Service Type
—
Point of Interconnection
Scattergood 230kV Switchyard
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- PALOVERDE
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LADWP-Q95