Project LADWP-Q96 — Project Summary

Queue ID
LADWP-Q96
Capacity
1000 MW
Technology
Solar+Battery
Status
active
Location
Los Angeles, CA
Region
West
Developer
IA Status
In Progress (unknown study)

LADWP-Q96

LADWP-Q96BetaActiveSolarBatteryLADWPLBNL

1,000 MW hybrid in Los Angeles, CA · In queue since March 2023 · Proposed COD November 2030

1,000 MW

Capacity

1

Components

Solar

3y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2030

Interconnection

Total Duration

7y 8m

In Study38%
Queue EntryMar 2, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-11-30

About

LADWP-Q96 is a proposed 1000 MW hybrid solar and battery energy storage project in Los Angeles County, California. The project, located in the Western region, is being developed by the Los Angeles Department of Water and Power (LADWP). The interconnection queue entry date is March 2, 2023, with a proposed commercial operation date of November 30, 2030. The project consists of 1000 MW of solar capacity.

The interconnection request is currently active in the LADWP queue, with the interconnection agreement status listed as "In Progress (unknown study)". The point of interconnection is the Scattergood 230kV Switchyard. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Los Angeles

Grid Region

Mountain West

Market

Developer

Utility

Los Angeles Department of Water and Power

Entity

LADWP

Service Type

Point of Interconnection

Scattergood 230kV Switchyard

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
PALOVERDE
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.