6.25 MW generation in Mercer, KY · In queue since November 2011 · Proposed COD March 2013
6.25 MW
Capacity
1
Components
Hydro
14y 6m
In Queue
IA Executed
IA Status
COD target: 2013
Total Duration
1y 4m
Schedule
160 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–36 months
Proposed COD: 2013-03-15
The proposed project LGE-KU-LGE-GIS-2011-005 is a 6.25 MW hydroelectric generation project located in Mercer County, Kentucky. The developer is Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU). The project consists of a single 6.25 MW hydro component.
This project is in the LGE-KU interconnection queue with a queue entry date of November 18, 2011, and a proposed commercial operation date of March 15, 2013. The interconnection agreement (IA) has been executed. The point of interconnection (POI) is Dix Dam Uprate.
Generated from interconnection queue and public data sources
State
KY
County
Mercer
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
Dix Dam Uprate
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LGE-KU-LGE-GIS-2011-005