LGE-KU-LGE-GIS-2019-001
110 MW generation in Washington, KY · In queue since January 2019 · Proposed COD December 2023
110 MW
Capacity
1
Components
Solar
7y 4m
In Queue
Suspended
IA Status
COD target: 2023
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-01
LGE-KU-LGE-GIS-2019-001 is a proposed solar generation project with a total capacity of 110 MW. The project is located in Washington County, Kentucky, within the Southeast region. Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) is the utility associated with the project, which entered the LGE-KU interconnection queue on January 15, 2019.
The proposed commercial operation date (COD) for the project was December 1, 2023. The interconnection agreement (IA) status is currently listed as suspended, and the overall project status is also suspended. The point of interconnection (POI) is the Lebanon _x0013_ Danville Tap 138 kV line.
Generated from interconnection queue and public data sources
State
KY
County
Washington
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
Lebanon _x0013_ Danville Tap 138 kV line
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.