Project LGE-KU-LGE-GIS-2019-008 — Project Summary

Queue ID
LGE-KU-LGE-GIS-2019-008
Capacity
100 MW
Technology
Solar
Status
suspended
Location
Caldwell, KY
Region
Southeast
Developer
IA Status
Suspended

LGE-KU-LGE-GIS-2019-008

LGE-KU-LGE-GIS-2019-008BetaSuspendedSolarLGE-KULBNL

100 MW generation in Caldwell, KY · In queue since March 2019 · Proposed COD December 2021

100 MW

Capacity

1

Components

Solar

7y 2m

In Queue

Suspended

IA Status

COD target: 2021

Interconnection

Total Duration

2y 9m

Suspended38%
Queue EntryMar 22, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-12-31

About

LGE-KU-LGE-GIS-2019-008 is a proposed 100 MW solar generation project located in Caldwell County, Kentucky. The project, under development by Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU), consists of 100 MW of solar photovoltaic generation. It is interconnected to the Louisville Gas & Electric and Kentucky Utilities Energy queue as project LGE-KU-LGE-GIS-2019-008, with a queue entry date of March 22, 2019.

The proposed commercial operation date (COD) for the project was December 31, 2021. The interconnection agreement (IA) status is currently listed as "Suspended," and the overall project status is also "suspended." The point of interconnection (POI) is the North Princeton 161 kV Substation.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Caldwell

Grid Region

Southeast

Market

Developer

Utility

Louisville Gas & Electric and Kentucky Utilities Energy

Entity

LGE-KU

Service Type

Point of Interconnection

North Princeton 161 kV Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
TVA
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.