Project LGE-KU-LGE-GIS-2021-025 — Project Summary

Queue ID
LGE-KU-LGE-GIS-2021-025
Capacity
19.98 MW
Technology
Solar
Status
active
Location
Wise, VA
Region
Southeast
Developer
IA Status
In Progress (unknown study)

LGE-KU-LGE-GIS-2021-025

LGE-KU-LGE-GIS-2021-025BetaActiveSolarLGE-KULBNL

19.98 MW generation in Wise, VA · In queue since October 2021 · Proposed COD December 2024

19.98 MW

Capacity

1

Components

Solar

4y 7m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 2m

Schedule

16 months past proposed COD

In Study38%
Queue EntryOct 6, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-31

About

LGE-KU-LGE-GIS-2021-025 is a proposed solar generation project with a total capacity of 19.98 MW. The project is located in Wise County, Virginia, within the Southeast region. Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) is the utility associated with the project. It consists of a single 19.98 MW solar component.

The project is currently active in the Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) interconnection queue, with an entry date of October 6, 2021. The proposed commercial operation date is December 31, 2024. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Dorchester to Blackwood 69 kV line.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Wise

Grid Region

Southeast

Market

Developer

Utility

Louisville Gas & Electric and Kentucky Utilities Energy

Entity

LGE-KU

Service Type

Point of Interconnection

Dorchester to Blackwood 69 kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Dominion
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.