19.98 MW generation in Wise, VA · In queue since October 2021 · Proposed COD December 2024
19.98 MW
Capacity
1
Components
Solar
4y 7m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 2m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
LGE-KU-LGE-GIS-2021-025 is a proposed solar generation project with a total capacity of 19.98 MW. The project is located in Wise County, Virginia, within the Southeast region. Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) is the utility associated with the project. It consists of a single 19.98 MW solar component.
The project is currently active in the Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) interconnection queue, with an entry date of October 6, 2021. The proposed commercial operation date is December 31, 2024. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Dorchester to Blackwood 69 kV line.
Generated from interconnection queue and public data sources
State
VA
County
Wise
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
Dorchester to Blackwood 69 kV line
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Dominion
- Hub Confidence
- UNKNOWN