LGE-KU-LGE-GIS-2021-027
10 MW generation in Wise, VA · In queue since October 2021 · Proposed COD October 2023
10 MW
Capacity
1
Components
Solar
4y 7m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2 years
Schedule
32 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-01
LGE-KU-LGE-GIS-2021-027 is a proposed solar generation project with a total capacity of 10 MW. The project is located in Wise County, Virginia, within the Southeast region. The developer is Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU).
The project is currently active in the LGE-KU interconnection queue, having entered the queue on October 25, 2021, with a proposed commercial operation date of October 1, 2023. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Dorchester - Bond 69 kV line.
Generated from interconnection queue and public data sources
State
VA
County
Wise
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
Dorchester - Bond 69 kV line
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Dominion
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LGE-KU-LGE-GIS-2021-027