LGE-KU-LGE-GIS-2023-0037
125 MW storage in Mercer, KY · In queue since April 2023 · Proposed COD December 2026
125 MW
Capacity
1
Components
Battery
3y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
3y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
Queue ID LGE-KU-LGE-GIS-2023-0037 is a proposed 125 MW battery storage project located in Mercer County, Kentucky, within the Southeast region. The project is being developed by Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU). It consists of a single 125 MW battery component.
The project is currently active in the LGE-KU interconnection queue, with an entry date of April 20, 2023, and a proposed commercial operation date of December 31, 2026. The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Brown North Substation 345 kV bus.
Generated from interconnection queue and public data sources
State
KY
County
Mercer
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
Brown North Substation 345 kV bus.
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LGE-KU-LGE-GIS-2023-0037