Project LGE-KU-LGE-GIS-2023-004 — Project Summary

Queue ID
LGE-KU-LGE-GIS-2023-004
Capacity
89 MW
Technology
Solar+Battery
Status
active
Location
Mercer, KY
Region
Southeast
Developer
IA Status
In Progress (unknown study)

LGE-KU-LGE-GIS-2023-004

LGE-KU-LGE-GIS-2023-004BetaActiveSolarBatteryLGE-KULBNL

89 MW hybrid in Mercer, KY · In queue since May 2023 · Proposed COD September 2027

89 MW

Capacity

1

Components

Solar

3 years

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

4y 4m

In Study38%
Queue EntryMay 2, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-01

About

LGE-KU-LGE-GIS-2023-004 is a proposed 89 MW hybrid solar and battery project located in Mercer County, Kentucky. The project, which consists of 89 MW of solar capacity, is being developed within the Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) service area.

The project entered the LGE-KU interconnection queue on May 2, 2023, with a proposed commercial operation date of September 1, 2027. Its interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the Harrodsburg _x0013_ West Cliff 69 kV line.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Mercer

Grid Region

Southeast

Market

Developer

Utility

Louisville Gas & Electric and Kentucky Utilities Energy

Entity

LGE-KU

Service Type

Point of Interconnection

Harrodsburg _x0013_ West Cliff 69 kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
TVA
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.