125 MW hybrid in Daviess, KY · In queue since July 2023 · Proposed COD September 2027
125 MW
Capacity
1
Components
Solar
2y 10m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-01
LGE-KU-LGE-GIS-2023-006 is a proposed 125 MW hybrid solar and battery project located in Daviess County, Kentucky. The project, under development by Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU), consists of 125 MW of solar capacity. It is currently listed as active in the LGE-KU interconnection queue, with a queue entry date of July 24, 2023, and a proposed commercial operation date of September 1, 2027.
The project's interconnection to the grid is planned at the Zion to Green River Steel 69kV line. The interconnection agreement (IA) status is currently "In Progress (unknown study)". The project has appeared in recent news coverage regarding renewable energy development in the Southeast region.
Generated from interconnection queue and public data sources
State
KY
County
Daviess
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
Zion to Green River Steel 69kV line
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.