LGE-KU-LGE-GIS-2023-007
138 MW generation in Hopkins, KY · In queue since August 2023 · Proposed COD December 2026
138 MW
Capacity
1
Components
Solar
2y 9m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
3y 4m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-12
Queue ID LGE-KU-LGE-GIS-2023-007 is a proposed solar generation project with a total capacity of 138 MW. The project is located in Hopkins County, Kentucky, within the service territory of Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU). The project entered the LGE-KU interconnection queue on August 21, 2023, and has a proposed commercial operation date of December 12, 2026.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The point of interconnection is the 161kV Earlington North Substation. The project is listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
KY
County
Hopkins
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
161kV Earlington North Substation
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LGE-KU-LGE-GIS-2023-007