LGE-KU-LGE-GIS-2024-001
75 MW hybrid in Grayson, KY · In queue since January 2024 · Proposed COD December 2027
75 MW
Capacity
1
Components
Solar
2y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
3y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
LGE-KU-LGE-GIS-2024-001 is a proposed 75 MW hybrid solar and battery project located in Grayson County, Kentucky. The development project, located in the Southeast region, is being proposed by Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU). The project consists of 75 MW of solar capacity.
The project is currently active in the Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) interconnection queue, with a queue entry date of January 23, 2024. The proposed commercial operation date is December 31, 2027. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Ohio Co_x0013_Leitchfield 69 kV Line.
Generated from interconnection queue and public data sources
State
KY
County
Grayson
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
Ohio Co_x0013_Leitchfield 69 kV Line
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project LGE-KU-LGE-GIS-2024-001