Project LGE-KU-LGE-GIS-2024-001 — Project Summary

Queue ID
LGE-KU-LGE-GIS-2024-001
Capacity
75 MW
Technology
Solar+Battery
Status
active
Location
Grayson, KY
Region
Southeast
Developer
IA Status
In Progress (unknown study)

LGE-KU-LGE-GIS-2024-001

LGE-KU-LGE-GIS-2024-001BetaActiveSolarBatteryLGE-KULBNL

75 MW hybrid in Grayson, KY · In queue since January 2024 · Proposed COD December 2027

75 MW

Capacity

1

Components

Solar

2y 4m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

3y 11m

In Study38%
Queue EntryJan 23, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

LGE-KU-LGE-GIS-2024-001 is a proposed 75 MW hybrid solar and battery project located in Grayson County, Kentucky. The development project, located in the Southeast region, is being proposed by Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU). The project consists of 75 MW of solar capacity.

The project is currently active in the Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) interconnection queue, with a queue entry date of January 23, 2024. The proposed commercial operation date is December 31, 2027. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Ohio Co_x0013_Leitchfield 69 kV Line.

Generated from interconnection queue and public data sources

Project Details

State

KY

County

Grayson

Grid Region

Southeast

Market

Developer

Utility

Louisville Gas & Electric and Kentucky Utilities Energy

Entity

LGE-KU

Service Type

Point of Interconnection

Ohio Co_x0013_Leitchfield 69 kV Line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
TVA
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.