LGE-KU-LGE-GIS-2024-002
75 MW generation in Madison, KY · In queue since February 2024 · Proposed COD April 2027
75 MW
Capacity
1
Components
Gas
2y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
3y 2m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-04-01
LGE-KU-LGE-GIS-2024-002 is a proposed 75 MW gas-fired generation project located in Madison County, Kentucky. The project is being developed by Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU). It consists of a single 75 MW gas component.
The project is currently active in the Louisville Gas & Electric and Kentucky Utilities Energy (LGE-KU) interconnection queue, with a queue entry date of February 21, 2024. The proposed commercial operation date is April 1, 2027. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is still to be determined during the scoping meeting.
Generated from interconnection queue and public data sources
State
KY
County
Madison
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
—
Point of Interconnection
TBD: During Scoping Meeting
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.